As part of the Tunis Light Rail electrification upgrade initiative, a new depot was constructed on the southern line to enhance daily maintenance and train dispatching efficiency. To support the depot’s increasing energy demands and to ensure operational safety, the local authority required a reliable, compact, and quickly deployable power distribution system.

Location:
Tunis, Tunisia
Project Year:
2022
Client Type:
Government Transportation Infrastructure
Solution Provided:

1250kVA Outdoor Prefabricated Substation (integrating MV switchgear, distribution transformer, and LV cabinet)

High protection-grade enclosure suitable for outdoor dusty and coastal conditions

Internal configuration optimized for space-saving and easy maintenance

Integrated cooling system and arc fault protection features

Fast plug-and-play installation at the construction site

On-site supervision and remote commissioning support

Project Outcome:
The prefabricated substation was successfully installed and energized within just 15 working days, significantly reducing civil work and site commissioning time. It ensured stable and uninterrupted power supply to the light rail depot’s operations and facilitated further automation upgrades. The client reported a 30% reduction in downtime compared to the previous modular distribution setup.
ABILKEEN’s outdoor substation solution provided a perfect balance of durability, safety, and flexibility for urban transportation energy systems.