Located in a key industrial hub in northern Italy, this petrochemical plant plays a critical role in the production and export of refined chemical products. Facing challenges such as increasing energy loads, aging substation equipment, and strict safety/environmental compliance requirements, the facility required a modern and space-efficient power distribution upgrade. ABILKEEN was selected to deliver a turnkey outdoor substation solution.

Location:
Lombardy Region, Italy
Project Year:
2023
Client Type:
Industrial – Petrochemical Production
Solution Provided:

24kV 10MVA Prefabricated Outdoor Substation

Primary Oil-Immersed Transformer with full protective relay system

RMU (Ring Main Unit) with modular SF6-insulated switchgear

Low-voltage power distribution cabinet with integrated power meters

IEC 61850-based SCADA remote monitoring system

Containerized housing with IP55 weatherproof rating

On-site commissioning support and engineer training services

Project Outcome:
The installation of the outdoor prefabricated substation significantly improved the facility’s power supply continuity and resilience under peak loads. The plug-and-play modular system reduced on-site construction time by over 40%, while the integrated remote monitoring platform allowed for proactive fault detection and reduced maintenance response time. ABILKEEN’s solution not only met the plant’s current power needs but also supported scalability for future expansions in production.