The client operates a major petrochemical complex in southern Italy, equipped with multiple distillation columns and reaction units. The existing power distribution system was aging, frequently unstable, and lacked intelligent monitoring features. With the expansion of new process units, the client required a complete upgrade of the 10kV medium voltage electrical system to ensure safe and efficient plant operations.

Location:
Southern Italy
Project Year:
2024
Client Type:
Petrochemical Manufacturer
Solution Provided:

Supplied two 2500kVA dry-type transformers with enhanced thermal and moisture resistance

Installed our KYN28-12 medium voltage switchgear with Siemens VCBs for maximum reliability

Integrated online power quality monitoring and an energy management system

Enabled seamless integration with the client’s DCS system for remote control and data logging

Full CE certification and successful trial run under full-load operation

Project Outcome:
The upgraded distribution system now operates with high stability, meeting the continuous high-demand requirements of the petrochemical process. The client reported a noticeable improvement in power factor, a 40% reduction in voltage fluctuations, and over 60% improvement in maintenance efficiency. The entire project was completed in just 35 days, demonstrating ABILKEEN’s speed and expertise in delivering power solutions to the oil & gas sector.