Introduction
As part of Singapore’s smart urban development strategy, the Marina East coastal district required a high-efficiency, low-maintenance electrical infrastructure for a new mixed-use complex integrating commercial offices, public utilities, and a critical water treatment facility. The system had to meet stringent local regulations, offer long-term operational reliability, and support future digital energy upgrades.
- Location:
- Marina East, Singapore
- Project Year:
- 2024
- Client Type:
- Urban Infrastructure Developer + Government-linked Utility Partner
- Solution Provided:
-
12kV KYN28-12 Medium Voltage Switchgear with intelligent protection relays
2x 2500kVA SCB13 dry-type transformers (Class F insulation, low-loss design)
Outdoor prefabricated compact substation units for plug-and-play deployment
Integrated EMS-ready metering and temperature monitoring systems
Integrated EMS-ready metering and temperature monitoring systems
- Project Outcome:
- The project achieved seamless integration with the building’s BMS (Building Management System) and SCADA platform. The installation passed local PUB and energy authority inspections, achieving a projected 99.97% uptime and reducing on-site maintenance by 30%. The client has confirmed ABILKEEN will be included in upcoming Phase II expansion bidding.
Other Cases
Support Center
-
Download Center
Get the latest product datasheets, technical drawings, PDU configurations, and safety certificates tailored for data center & commercial building environments.View Now -
FAQ
Explore answers to common questions about load redundancy, power path design, transformer selection, and remote monitoring systems. Fast answers from our engineers.View FAQ -
Contact Support
Have a project with unique space, redundancy, or monitoring needs? Our technical team is ready to help design and optimize your system.Get Support