Situated in Dubai's financial district, this 25-story office building was undergoing infrastructure modernization to support intelligent building management, EV charging, and 24/7 IT systems. Legacy power distribution systems lacked the flexibility and safety features required.

Location:
Dubai, United Arab Emirates
Project Year:
2022
Client Type:
Commercial High-rise Office Buildings
Solution Provided:

12kV KYN28-12 medium voltage switchgear

S13 dry-type transformers (10/0.4kV)

MNS low-voltage switchgear with intelligent MCCs

Intelligent lighting and air conditioning control panels

Dual-loop ATS cabinets for critical systems

Project Outcome:
After implementation, system power efficiency improved by 12%, and load balancing across peak hours became fully automated. Remote diagnostics reduced downtime by 30% through predictive maintenance alerts.